CFL Forge Control SUPER ADMIN Command OVERVIEW Funding DONORS Contractors TRACK A Subawards TRACK B Academic credit TRACK C Project repository VDR Talent scout AI Grant scout AI Payments PAYON Audit ledger IMMUTABLE Internal · Confidential CFL-SPEC-CONTRACTOR-002 Patent pending 64/123,976 Capital Forge League Work verification, donor funds, and payment control Acting as Mark R. Jones — super admin Elena Voss — technical lead James Okonkwo — finance Lavlesh Mishra — ops Emanuel J. Caraballo-Santiago — counsel Dr. Priya Shah — pi Dr. Amira Hassan — pi Marcus Hale — contractor MR Reset demo TRACK B University sponsored research CFL pays the institution, never a named student. Milestone awards, PI-certified progress, institutional invoice, technical + financial review, then a third authorizer. Built to SBIR-style subrecipient monitoring. UF · lead · $48,500 UCF CREOL · collaborating · $22,000 Tufts University · $980,000 UNIVERSITY OF FLORIDA BOARD OF TRUSTEES UF IPPD Senior Design — Helmet Screening Platform AY26–27 TRACK B · SUBAWARD LEAD JOINT · 2 SCHOOLS ACTIVE Named PI Dr. Priya Shah · pshah@ufl.edu Specialty Mechanical design, motion, machine vision, IPPD student capstone Payment basis milestone · retention 7 years UEI / EIN NNP7T1HZX9C4 · 59-6002052 Risk low · exclusion 2026-08-08 Design, build, and characterize an automated helmet screening platform: non-marking fixture, two-axis motion, surrogate specimens, machine vision, tamper-evident per-unit record. Work packages A–E. Fixed-amount milestone award. Personnel are university employees or students; CFL pays the institution only. Joint with UF (lead) + UCF CREOL (collaborating). Each school invoices CFL on its own subaward. Risk assessment PI progress report Export audit package Switch acting-as to Dr. Priya Shah to certify a PI report. BUDGET-TO-ACTUAL Cost centers CATEGORY BUDGETED ACTUAL NOTES Personnel (faculty coach + oversight) $18,000 $3,200 Institution payroll Student team support (institution) $8,000 $0 Never paid to named Track C students by CFL Materials & surrogates $7,500 $1,100 Printed targets, film coupons Equipment / metrology time $6,000 $0 Colorimeter, gloss meter Travel — Tampa site visit $4,500 $0 Mid-October Prototyping / shop $4,500 $400 No CNC requirement this year PAYMENT UNIT Milestones 1. Kickoff / ICD / requirements SUBMITTED $8,000 Interface documents issued. Requirements captured. Tolerance stack started. Exhibit A on file for all reviewing personnel. PI report: on file Work product: UF_IPPD_ICD_v0.2.pdf Invoice: UF-DSP-88421 Technical: approve Financial: open Authorizer: third actor required Technical approve Financial approve Authorize payment 2. Design Review 1 UPCOMING $10,000 Architecture trade study complete, fixture concept selected, first surrogate targets produced. Sponsor attends. PI report: missing Work product: missing Invoice: missing Technical: open Financial: open Authorizer: third actor required 3. Dual gate — pose + reading UPCOMING $12,500 Pose repeatability within tolerance AND working reading on surrogates. Either failure is a successful stop. PI report: missing Work product: missing Invoice: missing Technical: open Financial: open Authorizer: third actor required 4. Design Review 2 UPCOMING $10,000 Motion integrated, pose sequencing running, draft transfer analysis due. PI report: missing Work product: missing Invoice: missing Technical: open Financial: open Authorizer: third actor required 5. Final handover UPCOMING $8,000 Final report, public presentation (CFL-cleared), full documentation package. PI report: missing Work product: missing Invoice: missing Technical: open Financial: open Authorizer: third actor required